Converter Technology

Converter Technology Adds Conducted EMI Test Capability

Posted: 11 April, 2007

We have added conducted EMI test capability to our power lab which allows us to check all offline designs for EMI compliance before going to an outside test house. This gives you the following benefits:-

  • Reduces time and cost at an external test house
  • Speeds up your design cycle to get to production faster
  • Minimises cost of EMI filtering

RD004 passes EN55022 Conducted EMI measurements with greater than 15dBuV margin

Converter Technology engineers have many years experience in designing EMI compliant PSU’s with very low BOM cost. Check back soon since we will be updating our technical resources section to include more details on EMI, its causes and techniques to cost effectively meet the standards.